Facility upgrade for new chemical process. Installation of conduit, wire, and electrical apparatus for hook up of valves, flow meters, temperature sensors, motors and other electrical devices. Installation of multiple control cabinets and PLC terminations. All work performed involved explosion proof apparatus and devices and was scheduled over a six month period.
Future Fuel Control Electrical Installation
Project Details
Client
Future Fuel
Location
Batesville, AR
Schedule
6 months