Facility upgrade of control and power systems for paper mill equipment. Installation included thousands of feet of conduit, wiring, and electrical apparatus for hook up of drives, motors, conveyors, telemetry, and electrical devices. Installed additional drives for acid alkaline system. Install included conduit and wiring for lighting upgrade. Project installation was scheduled over a four month period to accommodate facility operations.
Green Bay Packaging Drive Install
Project Details
Client
Green Bay Packaging
Location
Morrilton, AR
Schedule
4 months